Project Description

HMP Wormwood Scrubs, London

Works include

  • The Refurbishment of 250 Cell Windows
  • Redecoration of a Wing housing approximately 400 Inmates
  • Refurbishment of the Staff Kitchen
  • Refurbishment of Wing Treatment room
  • Roofing works across the establishment
  • Refurbishment of all administration kitchens and washrooms
  • Re-pointing and repairs to the external perimeter wall – approximately 2km in length
  • Including infection control works including hygienic cladding to the walls, and the provision of prison-
  • experienced operatives
  • The rendering of an external wall measuring 300 linear metres x 4.5 metres high
HMP Wormwood Scrubs