Project Description
HMP Wormwood Scrubs, London
Works include
- The Refurbishment of 250 Cell Windows
- Redecoration of a Wing housing approximately 400 Inmates
- Refurbishment of the Staff Kitchen
- Refurbishment of Wing Treatment room
- Roofing works across the establishment
- Refurbishment of all administration kitchens and washrooms
- Re-pointing and repairs to the external perimeter wall – approximately 2km in length
- Including infection control works including hygienic cladding to the walls, and the provision of prison-
- experienced operatives
- The rendering of an external wall measuring 300 linear metres x 4.5 metres high